Interior Siding: Part II

This has been a wonderfully busy week for Tiny Refuge.  The replacement for my door finally arrived and it was installed.  The door they originally sent was 1/4″ too short, leaving enough space for the weather to get in. I have been waiting for the new door for months.  Not only do I have a new door, I have a door handle and a deadbolt.  Much fancier than the scraps of 2×4 that were standing in for a door handle.

I spent quite a few hours this week sanding the ridge beam.  I wasn’t sure if the ridge beam was going to be visible or not, so I didn’t get it sanded at the sawmill.  It had a few dark marks on it and was rough enough that you could get splinters if you rubbed it the wrong way.  I  used a palm sander and got that ridge beam smooth.  I am going to leave it exposed and as we installed some of the ceiling this weekend, it needed to be sanded before hand.

By the time Saturday rolled around, the tiny house was ready for some more siding.  Saturday we finished the dormer fronts and  the ceiling in the dormers.  The dormer fronts were pretty straightforward, with far fewer cutouts than the main floor.  The ceiling on the other hand was a little more challenging.  I am using wider boards on my ceiling and unlike the walls, where I manned the saw and Stefan did the installation, we were both up in the lofts getting the boards in place.  We started the installation at the ridge beam and then worked towards the walls.

Sunday, we started tackling the dormer sides and I was up in the loft installing the siding.  Saturday, I used a nail gun (the brad nailer) for the first time and Sunday I was manning the brad nailer.  The dormer sides are slow going.  The angles are slightly different on each one and the top two pieces of siding require cuts on the table saw and the mitre saw.  The tiny house only has space for the mitre saw, so the top two pieces required quite a few trips outside.  We got 5 ½ dormers done and one of the small sections of 12/12 pitch ceiling done in the small loft.

Next weekend: the dormer sides will get finished, as will the ceiling on the rest of the 12/12 ceiling. The bathroom wall will get built and sided and then we start on trim.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s